Road Improvements

Capital Road Investment 2022-2024

The Town financed $5 million for a road/bridge improvement plan during 2022-2024. This significant investment raised the overall level of road conditions throughout the Town on the PASER scale (pavement surface evaluation and rating). Before the work began, the overall PASER rating of Town roads was 5.85 / 10. Following completion of the three-year construction period, the rating increased to 7.49 / 10. The tax impact of the work is estimated at $0.31/$1,000 of assessed value, which was seen on tax bills beginning in December of 2022. Multiple grants were obtained during the capital investment period, including grant funding towards Cedar Sauk Road, Columbia Road, Sherman Road, and the Covered Bridge automobile bridge. Additional cost-sharing projects with neighboring communities included Susan Lane, Sycamore Drive, and Hilltop Drive through intergovernmental agreements. Savings that were realized through these efforts allowed for funds to be allocated toward modernizing the Town equipment fleet. Efforts continue to obtain additional grant funding for capital projects.

Current Road Construction Projects

County, State and Inter-Municipal projects are also shown, but are not managed by the Town.

 

Project Contact 2026 Town Managed Road Projects
Adam Monticelli
Director of Public Works
Phone: (262) 377-4509
Email: Adam
Road Sealing Project: Click HERE to see a Map of the Impacted Roads

Project Summary: The Town of Cedarburg has contracted with Fahrner Asphalt and Sealants to apply sealant to certain roadways. The work is currently scheduled to begin the week of August 24th and will last approximately 7 days depending on weather. There are approximately 18 segments of roadway or 13 miles that will be treated. The roadway list is below, notification letters can be viewed by clicking on this link, and signage will be posted at the ends of the roads to alert drivers. There is specific instruction to NOT drive on the treatment while it is curing, signs will be placed to advise of the treatment.  Homeowners that live on the roadway that are being treated will receive a door/mailbox hanger advising of the timeline and specific instructions for the day of the project. Homeowners will also receive a knock on the door the day of the operation to give advance notice of the project beginning and allowing you time to remove any vehicle from your driveway that you may need to.

1. Susan Lane - 0.23
2. Hilly Lane - 0.25
3. Horns Corners Road - 0.6 (Cedar Sauk Rd to Hilly)
4. Lawndale Drive - 0.25
5. Lofty Lane .2 (new surface only)
6. Bridge Street - 0.68 (Westridge to Municipal boundary (west))
7. Hilltop Drive - 0.14
8. Sherman Road - 0.45 (Elm Rd to Municipal boundary (west))
9. Sherman Rd – 1.0 (STH 181 – Horns Corners)
10. Sherman Rd – 1.0 (Horns Corners Rd to CTH Y)
11. Kuep Rd - .4
12. Cedarton Parkway - .55
13. Stonefield Subdivision – 1.15
14. Cedar Valley Dr - .3
15. Bittersweet Ln - .25
16. Sycamore Dr - .43
17. Cedar Sauk Rd – 2.4 (at Kings Ct East to Covered Bridge Rd)
18. Cedar Sauk Rd – 1.3 (at Covered Bridge Rd to CTH I)
19. Maple Rd – 1.0 (at Cedar Creek Rd to Pleasant Valley Rd)

Current Project Status: Tentative schedule to begin the week of August 24th.

Project Summary: No major Town roadway resurfacing is planned for this construction year due the extent of the resurfacing work 2022-2024. This allowed time to analyze the overall condition rating of Town roads following the work to see the positive impact the investment had on the PASER rating for the Finance Committee and Town Board to plan for future investments. The Town Public Works Crew will be completing the following projects this spring and summer:

  • Shoulder work
  • Minor culvert replacements
  • Drainage excavation and grading
  • Bridge repairs
  • Noxious weed removal
  • Sealing asphalt roadways that were recently resurfaced
  • Crack filling
  • Minor asphalt patching/pothole filling

Current Project Status: Ongoing

 

 

Project Contact 2026 Ozaukee County Projects 
Jon Edgren
Oz. Co. Highway Dept.
Phone: (262) 284-8331
Email Jon Edgren
Project Summary:  Ozaukee County is planning on conducting a 2.5” overlay of 5.1-miles of roadway on CTH I from Lilac Lane to STH 33 [Town of Cedarburg & Saukville]. Construction is anticipated for summer of 2026 with a target of end of August for completion. Please contact Ozaukee County Highway Department with any questions.

Current Project Status: Summer 2026 Construction

 

Future Project: 2027 Intersection at CTY Y and CTH T (Western and Granville)

Project Summary:  Ozaukee County is planning a concrete intersection reconstruction project at CTH Y (Granville Road) & CTH T (Western Ave). (Construction in 2027). Please contact Ozaukee County Highway Department with any questions.

Current Project Status: Summer 2027 Construction Anticipated

 

Project Contact

Nguyen Ly

(262) 548-8739

Nguyen.Ly@dot.wi.gov

Project Summary: The Wisconsin Department of Transportation (WisDOT) is proposing future roadway improvements along WIS 60 in Ozaukee County.

State of Wisconsin Managed Project

Scheduled for 2029

WisDOT Project website: Click here to view the webpage.

This project is tentatively scheduled for 2029 construction.  WIS 60, from Five Corners Drive to 1st Avenue, will be resurfaced and the bridge over Cedar Creek will receive a surface sealer. The traffic signals will be replaced at the intersections of WIS 60 with WIS 181, County I, Keup Road. Sidewalk ramps throughout the project will be upgraded to ADA standards, and new sidewalk will be constructed at the southwest quadrant of the intersection of WIS 60 and Washington Avenue. Culverts and guardrails will be replaced, and drainage work will include inlet replacements and grading around the bridge.

WIS 60 will be open to traffic during construction.